Categories
Ace Daily News

(VICTORIA) Tesla Battery Fire Report: A 13-tonne Tesla Megapack caught fire on Friday morning at a battery storage facility in south-east Australia #AceNewsDesk report

#AceNewsReport – July.31: The site was evacuated and there were no injuries, Victorian Big Battery said in a statement. It added that the site had been disconnected from the power grid and that there will be no impact to the electric supply. French energy company Neoen, which operates the facility, and contractor Tesla are working with emergency services to manage the situation…….

#AceDailyNews says a Tesla Megapack caught fire at the Victorian Big Battery facility in Australia and the blaze occurred during testing at between 10 and 10.15am local time, according to Victorian Big Battery. The regional fire service said a specialist fire crew had been dispatched to the site in Geelong, Victoria.

Saqib Shah is Contributor and writer at Engadget.

Firefighters were using a hazmat appliance designed for hazardous chemical spills and specialist drones to conduct atmospheric monitoring, according to Fire Rescue Victoria.

As a result of the fire, a warning for toxic smoke has been issued in the nearby Batesford, Bell Post Hill, Lovely Banks and Moorabool areas, reports The Sydney Morning Herald. Residents were warned to move indoors, close windows, vents and fireplace flues and bring their pets inside.

The Victorian Big Battery site, a 300 MW/450 MWh battery storage facility, is viewed as key to the Victorian government’s 50 percent renewable energy target by 2030. It follows the success of Neoen and Tesla’s 100 MW/129 MWh battery farm in Hornsdale in South Australia, which was completed ahead of schedule and has resulted in multi-million dollar savings for market players and consumers. Both sites essentially provide a regional power backup for when renewable energy is not available, effectively filling the gap when the sun isn’t shining and the wind isn’t blowing.

In February, Neoen announced that the Victorian Big Battery would utliize Tesla’s megapacks — utility-sized batteries produced at the company’s Gigafactory — and Autobidder software to sell power to the grid. Victorian Big Battery has a contract with the Australian Energy Market Operator (AEMO). As part of the pact, the site will provide energy stability by unlocking an additional 250 MW of peak capacity on the existing Victoria to New South Wales Interconnector over the next decade of Australian summers.

#AceNewsDesk report ………Published: July.31: 2021:

Editor says …Sterling Publishing & Media Service Agency is not responsible for the content of external site or from any reports, posts or links, and can also be found here on Telegram: https://t.me/acenewsdaily all of our posts fromTwitter can be found here: https://acetwitternews.wordpress.com/ and all wordpress and live posts and links here: https://acenewsroom.wordpress.com/and thanks for following as always appreciate every like, reblog or retweet and free help and guidance tips on your PC software or need help & guidance from our experts AcePCHelp.WordPress.Com

By ace101

Ace Worldwide News Group working with Kindness & Wisdom in perfect harmony to provide help and guidance through news & views and the truth to people in need Amen

This site uses Akismet to reduce spam. Learn how your comment data is processed.